Allumia · Under Review

Have an upgrade proposal sitting on your desk?

Get It Over
the Goal Line.

Allumia structures zero-upfront capital energy upgrades for ice rinks.

Upgrades that reduce energy use and operating costs — paid from measured energy savings over time.

Allumia funds the project, verifies the savings, and maintains the upgraded system during the program term.

See If Your Project Qualifies →
Hockey Arena
Why Upgrades Stall

Most rinks operate with aging refrigeration equipment that must run reliably every day. Operators work hard to keep these systems dependable while balancing tight budgets and full ice schedules.

Efficiency upgrades often make sense — but projects can stall because:

  • capital budgets are limited
  • projects compete with other priorities
  • moving a project from proposal to installation takes time and coordination

Meanwhile mechanical systems continue aging.

Many operators are balancing the need for upgrades with the reality of keeping the rink running through the season.

Ice rink equipment
The Allumia Model

Allumia helps move rink upgrades forward by combining three elements.

Capital
Projects move forward without upfront capital from the rink. The project is structured so upgrades are paid for through measured savings.
Performance
Savings are measured and verified, and the project is structured so upgrades are paid for through those savings.
Operations
Allumia manages the entire program — contractor coordination, system performance, and maintenance — so the rink can focus on the ice.
When the system performs efficiently, the rink saves energy and the program succeeds. Rink operators can focus on running the rink instead of managing mechanical systems.
How the Program Works Financially
Before Program
Your Utility Bill
Program Term  ·  Shared Savings
Your Savings
Amount to Allumia
Your Utility Bill
After Program  ·  You Keep Everything
Your Savings — 100%
Your Utility Bill
Your Savings
Amount to Allumia
Utility Bill

Upgrades are paid from measured energy savings — not your capital budget. When the program ends, the rink keeps the equipment and the full savings.

How Projects Move Forward

Many projects we review already begin with a proposal from a contractor.

1
Submit the proposal
Share the existing contractor proposal
2
Allumia evaluates
We review the project and savings potential
3
Zero upfront capital
If it qualifies, we structure the project
4
Contractor installs
Your contractor installs the upgrade
5
Savings verified
Allumia manages and verifies savings

During the program term, Allumia remains responsible for the performance of the installed measures.

When the program ends, the rink keeps the equipment and the full savings.

Submit Your Proposal for Review →

For Contractors
Have a customer who can't
move forward on an upgrade?

Bring the project to Allumia.

You keep the customer relationship and perform the installation.

Allumia provides the capital structure and manages the program.

This helps move projects forward that might otherwise remain on the shelf.

Submit a Proposal →

Contractor Designs & Installs
→ Designs the upgrade
→ Installs the equipment
→ Keeps the customer relationship
Allumia Funds & Manages
→ Funds the project
→ Structures the program
→ Verifies the savings
→ Manages performance

Upgrades That Often Qualify

If your rink already has a proposal for one of these upgrades, we can review whether it qualifies.

Refrigeration Controls

Controls & system optimization

Variable Frequency Drives

VFDs on pumps & fans

Heat Recovery

Heat recovery systems

Dehumidification

Dehumidification upgrades

LED Lighting

LED over-ice lighting

Ready to get it
over the goal line?

If your rink has an upgrade proposal under review, we may be able to help move it forward.